AGP Picks
View all

Underground drainage work requires closing a portion of Franklin Street on Monday, Nov. 16, in Detroit

News originally published by

Michigan Department of Transportation

Fast facts:

  • On Monday, Nov. 16, utility work will require closing Franklin Street to through-traffic between St. Antoine and Rivard streets.
  • During the closure, traffic will be detoured via Woodbridge Street.  
  • All lanes of Franklin Street are expected to open by mid-December.

DETROIT, Mich. - Weather permitting, crews will close both directions of Franklin Street between St. Antoine and Rivard streets in Detroit at 6 a.m. on Monday, Nov. 16. The closure is needed for crews to safely upgrade the underground drainage system. During the closure, through-traffic will be detoured via Woodbridge Street. Schweizer Place will also close in each direction between Franklin and Woodbridge streets.

Franklin Street is expected to open by mid-December.

During the closure, crews will install a hydrodynamic separator that is designed to clean stormwater and sewage before being discharged into the Detroit River during heavy rain events. This work is part of the new drainage outfall system that will provide lasting environmental benefits for residents and businesses along the I-375 corridor and the riverfront.  

Legal Disclaimer:

EIN Presswire provides this news content "as is" without warranty of any kind. We do not accept any responsibility or liability for the accuracy, content, images, videos, licenses, completeness, legality, or reliability of the information contained in this article. If you have any complaints or copyright issues related to this article, kindly contact the author above.

Share this page:

Advanced Search Options

Search for:

Search scope:

Type:

Search in:

Date range:

The last

Sort by:

Sign up for:

Michigan Business Tribune

The daily local news briefing you can trust. Every day. Subscribe now.

By signing up, you agree to our Terms & Conditions.